We email the buyers, you send the quote.
Buyers look for a second source once the first is booked out. We write to them before that, and anyone ready to share a drawing reaches you at once.
Example with made-up names
In short
B2B lead generation for suppliers and contract manufacturers: Plingway writes to purchasing first, then to engineering and production, and asks for a drawing instead of a meeting. Start plan: 500 emails every business day, USD 2,090 a month excl. VAT.
Audience
In manufacturing, no one picks a new supplier alone.
Purchasing collects quotes, engineering checks the drawing, and production decides if a new supplier fits the plant.
The roles we write to
- Purchasing managerLooks for second sources, compares price and lead time, and releases the order.
- Plant managerFeels bottlenecks first and wants parts that arrive on time and need no rework.
- Engineering managerSets material and tolerances and decides who can make a part at all.
- Maintenance managerBuys spare parts and service for the equipment on the floor.

Offers
What a plant will buy by email.
Sells well by email
- Contract machining with a clear range, such as turned parts from 50 pieces
- A second source for parts that are hard to get today
- Service and spare parts for common machines
- A quote from a drawing as an easy first step
Hard to sell by email
- Large equipment awarded through formal tenders
- Raw materials bought under framework contracts at daily prices
- Parts that need months of qualification before the first order
The best offer is one a buyer can check against a drawing.
Copy
The first email asks for a drawing, not a meeting.
How the first email is built
- SubjectThe parts in question and their company name.
- First lineA situation their industry knows, such as suppliers running full.
- ProofWhat you make: size, material, batch size, lead time.
- AskA current drawing, with a quote back in two days.
- Opt outOne short reply and no further email arrives.
For a buyer, a quote from a drawing is the smallest step. The email states your limits plainly.
Replies
Here, a yes often means a drawing is on its way.
You get the buyer’s role and the direct line from the signature. Call before the order goes elsewhere.
Plans
The number of matching plants decides the plan.
A machine shop only writes to companies that need its parts. We check first that they last six months.
All plans and termsFill in the form
Custom plan. More than 10,000 emails per business day, or several countries. Request a call
Example with made-up names.
One business day at full volume. Replies based on the market benchmark, not a promise.
Start
500 emails per business day
One process for a few related industries, such as turned parts for machinery makers in the US.
CHF 1,690 EUR 1,790 USD 2,090 GBP 1,490
per month, excl. VAT
- One-time setupCHF 1,090 EUR 1,190 USD 1,290 GBP 990
- Your audience should have about 24,500 decision makers to last six months
- Benchmark: about 19 positive replies a month
Example with made-up names.
One business day at full volume. Replies based on the market benchmark, not a promise.
Plus
1,000 emails per business day
Several industries or regions, such as sheet metal for equipment makers.
CHF 2,490 EUR 2,690 USD 2,990 GBP 2,290
per month, excl. VAT
- One-time setupCHF 1,290 EUR 1,390 USD 1,590 GBP 1,190
- Your audience should have about 49,000 decision makers to last six months
- Benchmark: about 37 positive replies a month
Example with made-up names.
One business day at full volume. Replies based on the market benchmark, not a promise.
Pro
2,500 emails per business day
A broad offer for many industries and countries, such as machine service.
CHF 4,490 EUR 4,890 USD 5,490 GBP 4,090
per month, excl. VAT
- One-time setupCHF 2,190 EUR 2,390 USD 2,690 GBP 1,990
- Your audience should have about 122,000 decision makers to last six months
- Benchmark: about 94 positive replies a month
3-month minimum term, billed monthly in advance, plus a one-time setup fee. The first sending month is half price because we ramp up slowly.
Market benchmark, not a promise: about 1.7 positive replies per 1,000 emails (public analysis of 1,160,919 emails, 45 clients, June 25 to September 23, 2026).
Questions
Questions from manufacturers
Who do you contact first: purchasing or engineering?
Usually purchasing, since they look for suppliers, and engineering for parts that need a new solution. You choose the roles in the form.
We make parts to print. Does that work by email?
Yes. The email asks for a drawing to quote. Anyone who wants to send one reaches you as a positive reply, with the phone number from the signature.
How many drawings will this bring each month?
You collect drawings yourself, so we count the positive replies: about 19 a month on the Start plan, derived from about 1.7 per 1,000 emails (public analysis of 1,160,919 emails, 45 clients, June 25 to September 23, 2026). That is a market benchmark, not a promise.
Next step
Tell us your parts and volumes.
Enter your website and list what you make, with materials and batch sizes. We will reply with a plan by the next business day.
Example with made-up names
